Saturday 10 November 2012

October, beginning to look like a home

October

The house comes together...


October achievements:
  • Kitchen and bathrooms cabinetry installed
  • Stairs installed
  • Painting, internal and external 90% done
  • Tiling to walls and floors wet areas
  • Hot water tank installed
  • Ceiling to alfresco installed
  • Lighting installed (not without a little drama!)
  • Fans, electrical, spa and dishwasher installed


Bedroom 5


Downstairs hall

Feature tile to ensuite shower

Ensuite walk in shower

Front of house

                    Kitchen
                                Walk in pantry   


Lounge room doors, stained

Bottom of staircase

Spring Has Sprung: September


Spring has sprung
September progress

Well, Septmber came and went in a hurry and while plenty of photos were taken they didn't make it to a post, until now that is...


Front of house






SOME internal pictures  (I have heaps!!)
Bedroom 5

                           Dining room window


Lounge and dining room doors


 
                                          Lounge window                                                View from Master suite
                                                                                       





Friday 9 November 2012

August: Part 2

August, house frame completion

We have been incredibly busy building our new home, and we also learned of a new addittion to our little family due next year, so suffice to say blogging has fell by the wayside.

But, here are some photos to show our ENORMOUS progress!!

August highlights:

  • Frame commenced and completed
  • 2nd storey frame and subfloor completed
  • Ducted aircon "rough-in" complete
  • Power and water to house
  • Colourbond roof commenced
  • Temporary downpipes woking, but no rain
  • Scaffolding and a ladder in the stair void