JULY, 2012


A few weeks ago we finally had the bank and the builder working in harmony and we were told they would start on site ASAP.  BUT.....the pegs were missing from the block!!  After two weeks with the surveyor (and a massive dip into our savings), we had new pegs....




Boundary pegs
Cost about as much as our car. 



25 JULY 2012

HOUSTON, WE HAVE LIFT OFF!

A year and a day since we found our little patch of dirt, we have progress with our site scrape and cut.  It's about bloody time!

Front of block, Elevation A - they even cut the driveway for us!

Very large pile of dirt at the rear of the property